In Situ Materials in the Building Renovation and Interior Typologies
Living Building Challenge·clause MT-006·p.344
The requirement
Living Building Challenge Program Manual clause MT-006 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
How it is proven
- Evidence required
- Only materials that are usually removed under the typical project scope of work and are within the LBC project boundary may be included as salvaged. For example, interior partitions, millwork, interior doors, and ceiling, wall, and floor finishes left in situ may be tracked as salvaged materials sourced on site.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Disclose — information the applicant must provide
- Standing
- Required — must be met for the credential
- Impact area
- Circular Economy — the CMF area the clause addresses
Cite this clause
Living Building Challenge · Living Building Challenge Program Manual · version 4.1 · clause MT-006 · page 344 · build 2026-10-05-0439 · https://klarcite.com/r/3705a57288faa6bf
Record details
Page 344. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 3705a57288faa6bf · document 117acb9730a17078 · fidelity verbatim · published 2026-01