The document this clause was read from is superseded. It is kept so older citations resolve.
Responsible land use
Concrete Sustainability Council·clause E2.02·p.24
The requirement
CSC Technical Manual (Recycled Aggregates) clause E2.02 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.
The clause is held and verified. Only its words are withheld.
How it is proven
- Evidence required
- Concrete: Site layout showing the locations of the main plant installations including roadways, stormwater drains, retention basins, etc. The layout plan includes an explanation as to why/how the site layout enables using the land in a particularly efficient way (e.g. biodiversity, efficient traffic flow, stormwater management, efficient storage / processing of materials). Cement / Aggregates: A quarry development plan is in place which includes the extraction plan and reclamation plan. AND Evidence that progressive reclamation is pursued where reasonably practical and permitted under local requirements.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Have in place — a plan, procedure or system the applicant must operate
- Standing
- Required — must be met for the credential
- Impact area
- Ecosystem Health — the CMF area the clause addresses
- Level
- Bronze — the level of the credential this clause belongs to
Cite this clause
Concrete Sustainability Council · CSC Technical Manual (Recycled Aggregates) · version v2.1 · clause E2.02 · page 24 · build 2026-10-05-0439 · https://klarcite.com/r/2d54d7ca96004f78
Record details
Page 24, E2 - Land Use. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 2d54d7ca96004f78 · document b101af454a6b608a · published 2022-10-21