Repurposed materials documentation

NABERS·clause 14.5.1·p.87

The requirement

The publisher’s words are shown on request, below the limits.

The publisher’s words

The publisher lets each reader see 18 of this document’s clauses a day when signed in, or 5 without signing in.

This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.

How it is proven

Evidence required
Invoices, delivery dockets, purchase orders, returnable schedules with name of letterhead or logo of the contractor, author (must be appropriate sub-contractor representative), and date of data entry. Documentation must identify specific products used, source location, material quantity, unit of measure and building section it was used in.
Who checks it
Applicant declares — a signed statement from the applicant

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Disclose — information the applicant must provide
Standing
Required — must be met for the credential
Impact area
Circular Economy — the CMF area the clause addresses

Cite this clause

NABERS · Embodied Carbon - The Rules · version v2.1 PILOT · clause 14.5.1 · page 87 · build 2026-10-05-0439 · https://klarcite.com/r/2cefda282c14046f

Not published at a public URL; the copy in the register was supplied directly to it.

Record details

Page 87 of the file (printed page 82), Section 7.6 Required information. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 2cefda282c14046f · document c88debbafaa182a7 · fidelity verbatim · published 2026-02