Chain of Responsibility Documentation
GECA·clause EV-4.1·p.32
The requirement
The publisher’s words are shown on request, below the limits.
The publisher’s words
The publisher lets each reader see 3 of this document’s clauses a day.
This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.
How it is proven
- Evidence required
- Appropriate state licenses, or an explanation why a license is not required; and Waste collection trucks GPS data; and Photographic or video recordings of waste collection and disposal; and Document outlining the amounts and origin of incoming waste and the destination of outgoing waste; and Document outlining the reporting and notification procedure of waste taken to an alternative facility; and Relevant weigh bridge data; and Current contracts with relevant licences of downstream contractors.
- Who checks it
- Customer or scheme checks — verified by a party with a stake, not an independent one
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Meet — a limit, condition or outcome the product must satisfy
- Standing
- Required — must be met for the credential
- Impact area
- Circular Economy — the CMF area the clause addresses
Cite this clause
GECA · Waste Collection Services · version WCS Gen 3.0 · clause EV-4.1 · page 32 · build 2026-10-05-0439 · https://klarcite.com/r/29504e6c767e36bb
Record details
Page 32. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 29504e6c767e36bb · document 18d89672a702c272 · fidelity close quote · published 2026-06