Chain of Responsibility Documentation

GECA·clause EV-4.1·p.32

The requirement

The publisher’s words are shown on request, below the limits.

The publisher’s words

The publisher lets each reader see 3 of this document’s clauses a day.

This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.

How it is proven

Evidence required
Appropriate state licenses, or an explanation why a license is not required; and Waste collection trucks GPS data; and Photographic or video recordings of waste collection and disposal; and Document outlining the amounts and origin of incoming waste and the destination of outgoing waste; and Document outlining the reporting and notification procedure of waste taken to an alternative facility; and Relevant weigh bridge data; and Current contracts with relevant licences of downstream contractors.
Who checks it
Customer or scheme checks — verified by a party with a stake, not an independent one

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Meet — a limit, condition or outcome the product must satisfy
Standing
Required — must be met for the credential
Impact area
Circular Economy — the CMF area the clause addresses

Cite this clause

GECA · Waste Collection Services · version WCS Gen 3.0 · clause EV-4.1 · page 32 · build 2026-10-05-0439 · https://klarcite.com/r/29504e6c767e36bb

Source document

Record details

Page 32. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 29504e6c767e36bb · document 18d89672a702c272 · fidelity close quote · published 2026-06