Protect salvaged demolition waste on site
Eco Choice Aotearoa·clause 8.2(b)·p.19
The requirement
The publisher’s words are shown on request, below the limits.
The publisher’s words
The publisher lets each reader see 4 of this document’s clauses a day.
This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.
How it is proven
- Evidence required
- Conformance with these requirements shall be stated in writing and signed by the Chief Executive Officer or other authorised representative of the applicant company. This statement shall be supported by: • evidence of the segregation system signage in action onsite, for example: photos of segregation system signage (e.g. bin labelling) during use. The BRANZ REBRI online guidelines provide good-practice advice on waste collection labelling (refer
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Have in place — a plan, procedure or system the applicant must operate
- Standing
- Required — must be met for the credential
- Impact area
- Circular Economy — the CMF area the clause addresses
Cite this clause
Eco Choice Aotearoa · Construction and Demolition Waste Services · version EC-59-19 · clause 8.2(b) · page 19 · build 2026-10-05-0439 · https://klarcite.com/r/2881422760c787d7
Record details
Page 19, 8.2 Practice. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 2881422760c787d7 · document 9075746d41273f76 · fidelity verbatim · published 2023-06
Other clauses in this standard
| Clause | Name |
|---|---|
| 4.2 | Structure of specification |
| 5.1(a)(i) | Minimise C&D waste generation |
| 5.1(a)(ii) | Implement waste hierarchy |
| 5.1(a)(iii) | Engage with other service providers and waste generators |
| 5.1(b)(i) | Waste minimisation in the project waste plan |
| 5.1(b)(ii) | Waste hierarchy in the project waste plan |