Cooling tower cycle optimization

LEED·clause WE CREDIT: OPTIMIZE PROCESS WATER USE·p.62

Klar Cite’s name for this clause. The publisher’s own heading may not be shown.

The requirement

LEED v4.1 Building Design and Construction Rating System clause WE CREDIT: OPTIMIZE PROCESS WATER USE — words not shown. Read it at the source. The held copy is a single-user licence and does not extend to republishing its clauses.

The clause is held and verified. Only its words are withheld.

Klar Cite classification — not the standard’s words

Addresses: process water use efficiency

written by a model, checked against the clause

Read it at the source

What the product must meet

Applies to
New Construction, Core & Shell, Schools, Retail, Data Centers, Warehouses & Distribution Centers, Hospitality, Healthcar

How it is proven

Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Meet — a limit, condition or outcome the product must satisfy
Standing
Required — must be met for the credential
Impact area
Ecosystem Health — the CMF area the clause addresses
Refers to
Table 1 — places elsewhere in the document

Cite this clause

LEED · LEED v4.1 Building Design and Construction Rating System · version v4.1 · clause WE CREDIT: OPTIMIZE PROCESS WATER USE · page 62 · build 2026-10-05-0439 · https://klarcite.com/r/245e27fc9d11dbff

Source document

Record details

Page 62. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 245e27fc9d11dbff · document 735b8f7d282ce93c · fidelity close quote · published 2025-02-01