Cooling tower cycle optimization
LEED·clause WE CREDIT: OPTIMIZE PROCESS WATER USE·p.62
Klar Cite’s name for this clause. The publisher’s own heading may not be shown.
The requirement
LEED v4.1 Building Design and Construction Rating System clause WE CREDIT: OPTIMIZE PROCESS WATER USE — words not shown. Read it at the source. The held copy is a single-user licence and does not extend to republishing its clauses.
The clause is held and verified. Only its words are withheld.
Klar Cite classification — not the standard’s words
Addresses: process water use efficiency
written by a model, checked against the clause
What the product must meet
- Applies to
- New Construction, Core & Shell, Schools, Retail, Data Centers, Warehouses & Distribution Centers, Hospitality, Healthcar
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Meet — a limit, condition or outcome the product must satisfy
- Standing
- Required — must be met for the credential
- Impact area
- Ecosystem Health — the CMF area the clause addresses
- Refers to
- Table 1 — places elsewhere in the document
Cite this clause
LEED · LEED v4.1 Building Design and Construction Rating System · version v4.1 · clause WE CREDIT: OPTIMIZE PROCESS WATER USE · page 62 · build 2026-10-05-0439 · https://klarcite.com/r/245e27fc9d11dbff
Record details
Page 62. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 245e27fc9d11dbff · document 735b8f7d282ce93c · fidelity close quote · published 2025-02-01