Report total weight of waste removed from site
Eco Choice Aotearoa·clause 5.3(c)(i)·p.13
The requirement
The publisher’s words are shown on request, below the limits.
The publisher’s words
The publisher lets each reader see 4 of this document’s clauses a day.
This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.
How it is proven
- Evidence required
- a copy of the annual report that includes criteria listed in 5.3(b), (c) and (d).
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Disclose — information the applicant must provide
- Standing
- Required — must be met for the credential
- Impact area
- Circular Economy — the CMF area the clause addresses
Cite this clause
Eco Choice Aotearoa · Construction and Demolition Waste Services · version EC-59-19 · clause 5.3(c)(i) · page 13 · build 2026-10-05-0439 · https://klarcite.com/r/21fb06e58bb36548
Record details
Page 13, 5.3 Communication and reporting. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 21fb06e58bb36548 · document 9075746d41273f76 · fidelity close quote · published 2023-06
Other clauses in this standard
| Clause | Name |
|---|---|
| 4.2 | Structure of specification |
| 5.1(a)(i) | Minimise C&D waste generation |
| 5.1(a)(ii) | Implement waste hierarchy |
| 5.1(a)(iii) | Engage with other service providers and waste generators |
| 5.1(b)(i) | Waste minimisation in the project waste plan |
| 5.1(b)(ii) | Waste hierarchy in the project waste plan |