Proper workmanship (quality assurance)

Blue Angel·clause 3.4·p.13

The requirement

The publisher’s words are shown on request, below the limits.

The publisher’s words

The publisher lets each reader see 3 of this document’s clauses a day.

This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.

How it is proven

Evidence required
technical data sheets, detailed application instructions as well as safety data sheets (for plasters and paints)
Who checks it
Applicant declares — a signed statement from the applicant

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Have in place — a plan, procedure or system the applicant must operate
Standing
Required — must be met for the credential

Cite this clause

Blue Angel · DE-UZ 140 External Thermal Insulation E T I C S · version DE-UZ 140 · clause 3.4 · page 13 · build 2026-10-05-0439 · https://klarcite.com/r/201852f640ece26a

Source document

Record details

Page 13. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 201852f640ece26a · document 99a9d98737ad09ca · fidelity verbatim · published 2019

Other clauses in this standard