Building envelope mass construction
LEED·clause not recorded·p.79
Klar Cite’s name for this clause. The publisher’s own heading may not be shown.
The requirement
LEED v4.1 Building Design and Construction Rating System — words not shown. Read it at the source. The held copy is a single-user licence and does not extend to republishing its clauses.
The clause is held and verified. Only its words are withheld.
Klar Cite classification — not the standard’s words
Addresses: opaque wall and floor material requirements
written by a model, checked against the clause
How it is proven
- Who checks it
- Applicant declares — a signed statement from the applicant
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Meet — a limit, condition or outcome the product must satisfy
- Standing
- Required — must be met for the credential
- Impact area
- Climate Health — the CMF area the clause addresses
Cite this clause
LEED · LEED v4.1 Building Design and Construction Rating System · version v4.1 · clause not recorded · page 79 · build 2026-10-05-0439 · https://klarcite.com/r/1d375a48a85e751a
Record details
Page 79. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 1d375a48a85e751a · document 735b8f7d282ce93c · fidelity verbatim · published 2025-02-01