Mixed-use buildings documentation

NABERS·clause 14.5.3·p.88

The requirement

The publisher’s words are shown on request, below the limits.

The publisher’s words

The publisher lets each reader see 18 of this document’s clauses a day when signed in, or 5 without signing in.

This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.

How it is proven

Evidence required
BoQ showing material quantities split by building types or areas, BIM, direct measurement using mark-ups of plans/wall schedules, as-built quantity evidence from the material supplier, area weighting based on as-built quantity evidence.
Who checks it
Applicant declares — a signed statement from the applicant

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Disclose — information the applicant must provide
Standing
Required — must be met for the credential

Cite this clause

NABERS · Embodied Carbon - The Rules · version v2.1 PILOT · clause 14.5.3 · page 88 · build 2026-10-05-0439 · https://klarcite.com/r/1babfde483fd8e5a

Not published at a public URL; the copy in the register was supplied directly to it.

Record details

Page 88 of the file (printed page 83), Section 7.9 Required information. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 1babfde483fd8e5a · document c88debbafaa182a7 · fidelity verbatim · published 2026-02