Responsible land use

Concrete Sustainability Council·clause E2.02·p.26

The requirement

CSC Technical Manual (Recycled Aggregates) clause E2.02 — words not shown. Read it at the source. The publisher reserves the right to its wording and sells access to it. The clause is held and cited here, and its words are read at the source.

The clause is held and verified. Only its words are withheld.

Read it at the source

How it is proven

Evidence required
1. Concrete: Site layout showing the locations of the main plant installations including roadways, stormwater drains, retention basins, etc. The layout plan includes an explanation as to why/how the site layout enables using the land in a particularly efficient way (e.g. biodiversity, efficient traffic flow, stormwater management, efficient storage / processing of materials). Cement / Aggregates: A quarry development plan is in place which includes the extraction plan, soil management plan, and reclamation plan. AND Evidence that progressive reclamation is pursued where reasonably practical and permitted under local requirements (see the annex).
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Disclose — information the applicant must provide
Standing
Required — must be met for the credential
Impact area
Ecosystem Health — the CMF area the clause addresses

Cite this clause

Concrete Sustainability Council · CSC Technical Manual (Recycled Aggregates) · version v3.0 · clause E2.02 · page 26 · build 2026-10-05-0439 · https://klarcite.com/r/13d97e54a211e909

Source document

Record details

Page 26. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 13d97e54a211e909 · document 0c76d0b579b9f3d6 · published 2025-07-01

Other clauses in this standard