The requirement

The publisher’s words are shown on request, below the limits.

The publisher’s words

The publisher lets each reader see 4 of this document’s clauses a day.

This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.

How it is proven

Evidence required
DoC EV-5.2.1: Copy of the Environmental Management System or similar showing testing requirements; testing frequency shall be weekly and the final calculation shall be the annual mean; or DoC EV-5.2.2: Sampling for COD analysis shall take place after the operation of any on-site wastewater treatment.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Meet — a limit, condition or outcome the product must satisfy
Standing
Required — must be met for the credential
Impact area
Ecosystem Health — the CMF area the clause addresses

Cite this clause

GECA · Panel Boards · version PB Gen 3.0 · clause EV-5.2 · page 42 · build 2026-10-05-0439 · https://klarcite.com/r/12f3ecb15473885f

Source document

Record details

Page 42, EV-5.2 WATER. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 12f3ecb15473885f · document 58ab1f45b86f0075 · fidelity verbatim · published 2026-06