Cement content requirements
GECA·clause EV-3.1.7·p.36
The requirement
The publisher’s words are shown on request, below the limits.
What the product must meet
Limits held for this clause
| Parameter / context | Operator | Limit | Unit |
|---|---|---|---|
| share | ≥ | 30 | % |
Compare this limit across schemes
The limit was read from the clause wording.
The publisher’s words
The publisher lets each reader see 7 of this document’s clauses a day when signed in, or 5 without signing in.
This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.
How it is proven
- Evidence required
- DoC EV-3.1.7.1: SCM: Information about the type and amount of SCM in the cement, and calculations showing the percentage (by mass) of SCM in the product.
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Meet — a limit, condition or outcome the product must satisfy
- Standing
- Required — must be met for the credential
- Impact area
- Climate Health — the CMF area the clause addresses
Cite this clause
GECA · Hard Surfacing · version HS Gen 3.0 · clause EV-3.1.7 · page 36 · build 2026-10-05-0439 · https://klarcite.com/r/124e551713073a89
Record details
Page 36, EV ENVIRONMENT. Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 124e551713073a89 · document bfb6399c60352ae9 · fidelity close quote · published 2026-06