Effective management policies for raw materials and waste storage

Eco Choice Aotearoa·clause 5.11.1·p.18

The requirement

The publisher’s words are shown on request, below the limits.

The publisher’s words

The publisher lets each reader see 4 of this document’s clauses a day.

This is the publisher’s condition for Klar Cite showing its words; the limits, the citation and everything else on this page are free to read. Showing the wording counts one clause.

How it is proven

Evidence required
details, including photographs, of the location and type of storage facilities on site and the materials stored in each; and a copy of the Spill Response Plan and records of test/drills, implementation and reviews.
Who checks it
Independent body verifies — a certifier, auditor or verifier with no stake

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Have in place — a plan, procedure or system the applicant must operate
Standing
Required — must be met for the credential
Impact area
Ecosystem Health — the CMF area the clause addresses

Cite this clause

Eco Choice Aotearoa · Flat and Long Steel · version EC-41-25 · clause 5.11.1 · page 18 · build 2026-10-05-0439 · https://klarcite.com/r/0da79a9867e08878

Source document

Record details

Page 18, Criteria. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 0da79a9867e08878 · document 82afabc3b3b8e097 · fidelity verbatim · published 2025-06

Other clauses in this standard