Renewable energy usage

LEED·clause EA-27·p.85

Klar Cite’s name for this clause. The publisher’s own heading may not be shown.

The requirement

LEED v4.1 Building Design and Construction Rating System clause EA-27 — words not shown. Read it at the source. The held copy is a single-user licence and does not extend to republishing its clauses.

The clause is held and verified. Only its words are withheld.

Klar Cite classification — not the standard’s words

Addresses: energy sourcing for buildings

written by a model, checked against the clause

Read it at the source

What the product must meet

The document’s own listing

Points Tier 1 Tier 2 Tier 3 CS CS BD+C CS BD+C (Except BD+C (Except CS) (Except CS) CS)

The document’s own compact listing of the limits, as harvested.

Applies to
New Construction, Core & Shell, Schools, Retail, Data Centers, Warehouses & Distribution Centers, Hospitality, Healthcar

How it is proven

Who checks it
Applicant declares — a signed statement from the applicant

How Klar Cite classifies it

Klar Cite’s reading of the clause, not the scheme’s own claim.

What it asks
Meet — a limit, condition or outcome the product must satisfy
Standing
Required — must be met for the credential
Impact area
Climate Health — the CMF area the clause addresses

Cite this clause

LEED · LEED v4.1 Building Design and Construction Rating System · version v4.1 · clause EA-27 · page 85 · build 2026-10-05-0439 · https://klarcite.com/r/0728b6f8a9ded25f

Source document

Record details

Page 85. Read in build 2026-10-05-0439, harvested 2026-10-05.

uid 0728b6f8a9ded25f · document 735b8f7d282ce93c · fidelity verbatim · published 2025-02-01