Fuel switching and renewable energy
Green Star·clause R3.15.11·p.166; 170
Klar Cite’s name for this clause. The publisher’s own heading may not be shown.
The requirement
Green Star Design & As Built Submission Guidelines (v1.3, as downloaded 2026) clause R3.15.11 — words not shown. Read it at the source. The held copy is a single-user licence and does not extend to republishing its clauses.
The clause is held and verified. Only its words are withheld.
Klar Cite classification — not the standard’s words
Addresses: fossil fuel use and onsite renewables
written by a model, checked against the clause
How it is proven
- Who checks it
- Independent body verifies — a certifier, auditor or verifier with no stake
How Klar Cite classifies it
Klar Cite’s reading of the clause, not the scheme’s own claim.
- What it asks
- Meet — a limit, condition or outcome the product must satisfy
- Standing
- Required — must be met for the credential
- Impact area
- Climate Health — the CMF area the clause addresses
Cite this clause
Green Star · Green Star Design & As Built Submission Guidelines (v1.3, as downloaded 2026) · version v1.3 · clause R3.15.11 · page 166; 170 · build 2026-10-05-0439 · https://klarcite.com/r/019b9e5333bbbf75
Record details
Page 166; 170 of the file (printed page 166). Read in build 2026-10-05-0439, harvested 2026-10-05.
uid 019b9e5333bbbf75 · document 7ab8c8a2e0bda472 · fidelity close quote · published 2019-09